Requesting Water Service
The following steps can be used as guidelines for requesting water service. Please review each section carefully to determine which situation is applicable to your situation. If you have any questions at anytime, please do not hesitate to call or email us with your questions.
New Service for Existing Meter Box with an Existing Meter and Active Service
The following procedure is for homes requesting new service and a meter box already exists with a meter currently installed in the meter box.
Complete the New User Agreement form from our website. The New User Agreement Form must be completed, signed, and mailed, along with a payment of $75.00 to:
BCWA #4
P.O. Box 861
Lowell, AR 72745-0861
DO NOT SEND CASH - For credit card payments, please contact the office. A Credit card fee of 2.5% (minimum of $1.75) will be applied.
Contact the billing office and let them know when you wish service to begin. Once the User Agreement form and payment have been received, we will set up your account and send you a welcome email with your account information and other useful information such as how to register for an online account..
Existing Home with Existing Meter Box with No Meter
The following procedure is for homes requesting new service and a meter box already exists, but no meter is in the meter box:
Complete the New User Agreement form from our website. The New User Agreement Form must be completed, signed, and mailed, along with a payment of $400.00 to:
BCWA #4
P.O. Box 861
Lowell, AR 72745-0861
DO NOT SEND CASH - For credit card payments, please contact the office. A Credit card fee of 2.5% (minimum of $1.75) will be applied.
Once the User Agreement form and payment have been received, we will schedule the Water Operator to come out to install a meter in your meter box.
New Home or Water Line Construction
If you need water service for a home under construction or if you need new service installed at an existing location please follow these guidelines:
Before any water service can be connected, we must have a septic approval from the Arkansas Department of Health. To obtain a permit, please visit the Arkansas Department of Health's website at: https://onsitewastewater.adh.arkansas.gov/DesignatedRepLicenseesNearYou/Show-DesignatedRepLicenseesNearYou-Table1.aspx
Select License Type: Designated Representative Permit
Enter the zip code for the property in need of a septic approval
Enter the number of miles for your search perimeter (typically 25 miles).
You will be provided a list of qualified representatives you may contact for your septic approval.
Once you have a copy of your septic approval, please complete the New User Agreement form from our website. The New User Agreement Form must be completed, signed, and mailed, along with the septic approval and payment of $2000.00 to:
BCWA #4
P.O. Box 861
Lowell, AR 72745-0861
DO NOT SEND CASH. - For credit card payments, please contact the office. A Credit card fee of 2.5% (minimum of $1.75) will be applied.
Contact BCWA #4 to schedule a site visit by calling (479)877-9364. The operator will need to verify the location of the existing water line as it relates to your property, determine if any easements or road crossings are needed, and discuss a potential location for your meter box.
BCWA #4 will install the connection from the existing water line up to your meter box. It is the homeowner’s responsibility for the connection running from the meter box to the home. Please download the “Procedures to Activate Water Service” document for steps necessary to do this.
Once all the necessary steps have been completed as outlined in the “Procedures to Activate Water Service” section below, our operator will set and turn on your meter. The operator will not turn on the water valve. You will need to do that when you are ready for water.
Procedures to Activate Water Service
*** NOTE: Before any water service can be connected, we must have a septic approval from the Arkansas Department of Health. To obtain a permit, please visit the Arkansas Department of Health's website at:
Select License Type: Designated Representative Permit
Enter the zip code for the property in need of a septic approval
Enter the number of miles for your search perimeter (typically 25 miles).
You will be provided a list of qualified representatives you may contact for your septic approval.
All connections and services shall meet or exceed the standards of the Arkansas Department of Health Plumbing Code (Rules and Regulations). Please note this document has not been reviewed or approved by the Arkansas Department of Health, and it is recommended that a licensed master plumber be contacted before proceeding. This document is only provided to assist you through the process to obtain water service from BCWA #4 to your home.
Notes: